Commercial & Industrial

Roof Systems

Our unique roof system provided Baulderstone with a 640m2 temporary roof to allow works at the Tarrago treatment plant in Drouin West.And a very fast Keder roof system that was erected in one day.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Suspended Scaffolds

A suspended Scaffolding platform provided an easy access for this outlet structure on the Silvan Resevoir which was 300m out in the middle of a lake at a water level of 100 feet. We had to construct pontoons to carring our eqipment safely to the site then build from the inside out for the painters to gain access.

Thanks to Melbourne Water and Transfield for allowing us to show them how easy it is to do a very difficult job.

 

 

Towers

This 60m tower was constructed at Laverton for maintenance purposes in 4-days using a man and materials hoist system allowing our client to gain access and complete their works in time without any delays. It was the first time a Scaffold company was able to do this thanks to our new system.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We completed this tower at the shire offices for Fitzroy Council in Melbourne. An 8 tonne counter lever working platform was erected over the roof without the need for any internal propping.

And now we have just completed the Ballarat Town Hall Clock Tower in June 2010

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Engineered drawings can be provided on request.

 

If any requirements for heavy duty Gantry system don't look anymore check out Speedy Gantry we have just started Installing them in Melbourne.

You can go to www.speedygantry.com.au and check out some jobs they have been working on over the last 20 years. 

We are proud to be associated with Speedy Gantry.