Commercial & Industrial

                   East Link Extension Project Melbourne and the Knox Private Hospital extension Project.

 

 

 

 

 

 

 

 

 

 

 

 

Roof Systems

Our unique roof system provided Baulderstone with a 640m2 temporary roof to allow works at the Tarrago treatment plant in Drouin West. This Keder roof system was erected in one day.

                                                                      

 

 

 

 

 

 

 

 

 

 

Restoration Works

A suspended Scaffolding platform provided an easy access for restoration works at this outlet structure on the Silvan Resevoir.Equipment was safely carried out 300 metres on pontoons into the middle of the lake and assembled. 

A free standing tower provided a safe working platform for stone maisonary work needed to restore this Heritage building.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This 60m tower was constructed at Laverton for maintenance purposes in 4-days using a Maber Hoist System.Our client was most impressed with this efficient system and was able to proceed quickly without delays 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

An eight tonne counter lever working platform was erected over the roof of the Fitzroy Town Hall without the need for any internal propping.

 Ballarat Town Hall Clock Tower. 

 

 

 

 

 

 

 

 

 

 

 

 

Engineered drawings can be provided on request